Large 8000 sq ft Restaurant Space | Delivering January 2025 | Available for outfitting Now!
The space overlooking the terrace downstairs will feature large glass windows, bathrooms, kitchen area, dumb waiter and elevator. The space features the opportunity for an indoor and outdoor dining experience.
There is also an option for a roof top bar area – please enquire for more information.
Welches Plaza
Barbados Welches Plaza sits on an 8-acre site located on the main highway that connects all points of the compass on the Island. The mixed-use commercial development, 7 buildings, over 200,000 Sq. Ft has parking for over 500 cars. It is surrounded by commercial & residential developments. It is truly an amazing demographic.
The project was conceptualized in 2010 in response to several larger retail business needs for a location well situated with access to the highway. As a result of interest expressed by an offshore health care provider, they repurposed 2 buildings 100,000 Sq Ft for a 100-bed tertiary care hospital with a focus on medical tourism.
Green initiatives
Due to the size of the Welches site & concerns with the development’s impact on the area’s environment, consultants collaborated with the TC&P, & EPD authorities to configure a drainage network with 16 wells & 8 storage tanks that would not only capture & store surface water to be used by the development but also would alleviate perennial flooding issues that the area experienced. Bathrooms are being fed by the water that’s in wells & irrigation is also supplied from the wells.
The site will have the capacity to support up to 1.5 megawatts of Photo Voltaic energy production. The buildings were designed with a mono pitch roof design to efficiently capture the greatest amount of sunlight during peak times of the day throughout the year.
The mix of businesses will be complimentary to the area & the location. These consist of the following Mix:
- Multiplex cinema
- Fitness center
- Hardware store
- Fashion businesses
- Pharmacy
- Department store
- Convenience store
- Bank
- Furniture & appliances
- Computer & IT
- Urgent care
- Hospital
- Food & entertainment – 7 restaurants
Progress update as of Summer 2024
4 buildings are being handed over to tenants during July 2024, some of these businesses plan to open during November 2024; 1 building will be handed over to the tenants in January 2025.